HRI-R22t
FUNCTIONING PRINCIPLE
Insulation resistance is measured by applying a direct current signal between the isolated line and earth: the level of insulation can be determined by measuring the leakage current to earth. HRI-R22t ensures an effective measurement of the insulation resistance even in the presence of strong interference and high harmonic or direct-current components, due to its sophisticated digital filter.
PROGRAMMING
The device offers broad programming possibilities through its microswitches for threshold setting.
COMPLETE MONITORING OF ALL ELECTRICAL PARAMETERS
HRI-R22t tests the thermal and electric overload of the insulating transformer, managing one PTC probe. The electric overload monitoring of the medical transformer can also be tested by connecting a current transformer and setting appropriate alarm thresholds. The alarms can be controlled remotely by connecting up to four PR signalling panels.
SELF TESTING SYSTEM
Error-Link Fail system checkes that the terminals are connected correctly: it prevents the possibility to operate.
- HRI R22t (pdf)







